logo
products
PRODUCTS DETAILS
Home > Products >
7075 7175 7020 CNC Machine Parts Aluminum Forgings Customized for Ford F 150

7075 7175 7020 CNC Machine Parts Aluminum Forgings Customized for Ford F 150

MOQ: 1PCS
Price: Negotiations
Standard Packaging: wooden pallet
Delivery Period: 10~20days
Payment Method: T/T, L/C
Supply Capacity: 1000 MT /per month
Detail Information
Place of Origin
CHINA
Brand Name
JIMA
Certification
ISO9001-2008,SGS,ROHS.
Model Number
ALP
Application:
Auto Parts
Name:
Customized 7075 Aluminum Forging Parts
Standard:
JIS, DIN, BS, ASTM, SAE.
Technics:
Forging
Alloy:
7075, 7175 7020 2219, Customize
Sample:
Can Be Customized
Highlight:

7020 Aluminum Forgings

,

Aluminum Forging CNC Machine Part

,

Ford F 150 Aluminum Forgings

Product Description
Customized 7075 7175 7020 aluminum forging Parts , Ford f 150 Aluminum Parts for Auto Parts
 
Product Description
 
Product name Customized 7075 7175 7020 aluminum forging Parts
Tolerance 0.003mm-0.01mm
Surface finish Based on customer requirements, we can do Plating(Zinc plated, Nickel plated, Chrome plated,etc), polishing(precision can reach +/-0.005mm), knurling, anodizing, Black Oxide, heat treatment, sandblasting, powder coating, etc.
Precision processing turning, milling, drilling, grinding, wire-EDM cutting etc
Material range  Aluminum 
  Plastic : PU, PVC, POM, PMMA, Nylon ,HDPE etc.
QC(inspection everywhere) - Technicians self-check in production
  - Engineer spot check in production.
  - QC inspect after products finished
  - International sales who were trained the technical know-how spot check before shipping to ensure the quality.
Material 2014/2025/2219/5083/6061/6066/6151/7049/7050/7075/7175
Temper  T6 T8 etc.
Application Aviation/ navigation/ machinery etc
Payment 30% in advance, 70% before shipment
Shipment terms 1) 0-100kg: air freight priority,
  2) >100kg: sea freight priority,
  3) As per customized specifications

 

FAQ

Q: How long is your delivery time?
A: Generally it is 5-10 days for sample.

 

18-20 days for mass production.

Q: Do you provide samples ? is it free or extra ?

 

A: Yes, we could offer the sample.

And sometimes for free charge but do not pay the cost of freight.

 

 

Our Competitive Advantages:
1. Much experiencing in forging part
2. Disciplined staffs and scientific operation;
4. Product performance;
5. Advanced produce and inspecting equipments;
6. Prompt Delivery;
7. Quality control system: ISO 9001: 2000& 14001: 2004&ISO/TS16949

 

 
Our Aluminum Forging Parts Photo Show:
 
7075 7175 7020 CNC Machine Parts Aluminum Forgings Customized for Ford F 150 0
7075 7175 7020 CNC Machine Parts Aluminum Forgings Customized for Ford F 150 1
 
 
 
 
products
PRODUCTS DETAILS
7075 7175 7020 CNC Machine Parts Aluminum Forgings Customized for Ford F 150
MOQ: 1PCS
Price: Negotiations
Standard Packaging: wooden pallet
Delivery Period: 10~20days
Payment Method: T/T, L/C
Supply Capacity: 1000 MT /per month
Detail Information
Place of Origin
CHINA
Brand Name
JIMA
Certification
ISO9001-2008,SGS,ROHS.
Model Number
ALP
Application:
Auto Parts
Name:
Customized 7075 Aluminum Forging Parts
Standard:
JIS, DIN, BS, ASTM, SAE.
Technics:
Forging
Alloy:
7075, 7175 7020 2219, Customize
Sample:
Can Be Customized
Minimum Order Quantity:
1PCS
Price:
Negotiations
Packaging Details:
wooden pallet
Delivery Time:
10~20days
Payment Terms:
T/T, L/C
Supply Ability:
1000 MT /per month
Highlight

7020 Aluminum Forgings

,

Aluminum Forging CNC Machine Part

,

Ford F 150 Aluminum Forgings

Product Description
Customized 7075 7175 7020 aluminum forging Parts , Ford f 150 Aluminum Parts for Auto Parts
 
Product Description
 
Product name Customized 7075 7175 7020 aluminum forging Parts
Tolerance 0.003mm-0.01mm
Surface finish Based on customer requirements, we can do Plating(Zinc plated, Nickel plated, Chrome plated,etc), polishing(precision can reach +/-0.005mm), knurling, anodizing, Black Oxide, heat treatment, sandblasting, powder coating, etc.
Precision processing turning, milling, drilling, grinding, wire-EDM cutting etc
Material range  Aluminum 
  Plastic : PU, PVC, POM, PMMA, Nylon ,HDPE etc.
QC(inspection everywhere) - Technicians self-check in production
  - Engineer spot check in production.
  - QC inspect after products finished
  - International sales who were trained the technical know-how spot check before shipping to ensure the quality.
Material 2014/2025/2219/5083/6061/6066/6151/7049/7050/7075/7175
Temper  T6 T8 etc.
Application Aviation/ navigation/ machinery etc
Payment 30% in advance, 70% before shipment
Shipment terms 1) 0-100kg: air freight priority,
  2) >100kg: sea freight priority,
  3) As per customized specifications

 

FAQ

Q: How long is your delivery time?
A: Generally it is 5-10 days for sample.

 

18-20 days for mass production.

Q: Do you provide samples ? is it free or extra ?

 

A: Yes, we could offer the sample.

And sometimes for free charge but do not pay the cost of freight.

 

 

Our Competitive Advantages:
1. Much experiencing in forging part
2. Disciplined staffs and scientific operation;
4. Product performance;
5. Advanced produce and inspecting equipments;
6. Prompt Delivery;
7. Quality control system: ISO 9001: 2000& 14001: 2004&ISO/TS16949

 

 
Our Aluminum Forging Parts Photo Show:
 
7075 7175 7020 CNC Machine Parts Aluminum Forgings Customized for Ford F 150 0
7075 7175 7020 CNC Machine Parts Aluminum Forgings Customized for Ford F 150 1